| Materials | 8'x8' | 8'x10' | 8'x12' | 8'x16' | 8'x20' |
| 4 way dek-block+ piers | 12 | 12 | 12 | 20 | 20 |
| 8' 2x6 treated lumber | 24 | 24 | 28 | 44 | 45 |
| 10' 2x6 treated lumber | - | 4 | - | - | 8 |
| 12' 2x6 treated lumber | - | - | 4 | - | - |
| 8' 4x4 treated lumber | 2 | 2 | 2 | 4 | 4 |
| 2-1/2' galv. deck screws | 3lbs | 4lbs | 5lbs | 7lbs | 7lbs |
| construction adhesive-tubes | 1 | 1 | 1 | 2 | 2 |
| stain or sealer, gallons | 1 | 1 | 1 | 2 | 2 |
| metal truss plates | - | - | - | 8 | 8 |
| 1/4' dowel | 1 | 1 | 1 | 1 | 1 |
| Materials | 10'x10' | 10'x12' | 10'x16' | 10'x20' |
| 4 way dek-block+ piers | 15 | 15 | 25 | 25 |
| 8' 2x6 treated lumber | - | - | 10 | - |
| 10' 2x6 treated lumber | 29 | 28 | 36 | 55 |
| 12' 2x6 treated lumber | - | 5 | - | - |
| 8' 4x4 treated lumber | 3 | 3 | 5 | 5 |
| 2-1/2' galv. deck screws | 5lbs | 5lbs | 8lbs | 8lbs |
| construction adhesive-tubes | 1 | 1 | 1 | 2 |
| stain or sealer, gallons | 1 | 1 | 1 | 2 |
| metal truss plates | - | - | 10 | 10 |
| 1/4' dowel | 1 | 1 | 1 | 1 |
| Materials | 12'x12' | 12'x16' | 12'x20' |
| 4 way dek-block+ piers | 18 | 30 | 30 |
| 8' 2x6 treated lumber | - | 12 | - |
| 10' 2x6 treated lumber | - | - | 12 |
| 12' 2x6 treated lumber | 34 | 34 | 45 |
| 8' 4x4 treated lumber | 3 | 5 | 5 |
| 2-1/2' galv. deck screws | 6lbs | 8lbs | 9lbs |
| construction adhesive-tubes | 2 | 2 | 3 |
| stain or sealer, gallons | 2 | 2 | 3 |
| metal truss plates | - | 12 | 12 |
| 1/4' dowel | 1 | 1 | 1 |
Position and level 4 Way Dek-Block+™ piers. Use a 2 x 6 support board and the spacing measurements shown in the plans for the deck of your choice. Adjust 4 Way Dek-Block+™ piers until the top edge of the 2 x 6 support board is level.
(NOTE: For 16 and 20-foot deck lengths, connect two 8 or 10-foot support boards end-to-end by nailing a perforated metal truss plate to both sides of the joint as shown. Make sure that a 4 Way Dek-Block+™ pier is positioned directly under the joint).
Position and level all 2 x 6 support boards. Make sure that the top edges of all the support boards are level with each other.
Square up 2 x 6 deck support boards and add 2 x 6 boards to finish both open ends.
To square up support boards, measure diagonally form ends of outside support boards (corner to corner). Adjust position of outside support boards until diagonal distance between opposite corners is EQUAL. Screw a 2 x 6 board across one open end, adjusting all inside support boards so they butt flush against the finish board. Screw the second finish board across the other open end.
Add 2 x 6 decking surface. Place ALL decking on the deck before screwing. Space decking board 1/4' apart on support boards using a 1/4' dowel as a guide. Adjust as necessary to ensure that the decking boards overlap the finish boards on each end by the same amount. When all decking is in position, remove each board and apply a bead of construction adhesive to the top edge of the support board beneath it. Put board back in place and secure with 2-1/2' deck screws (two screws per support board).
Position centers of outer 2 x 2 boards 5' in from each end of 2 x 6 handrail board, and attach with one 2-1/2' decking screw at the top. Attach bottom ends of 2 x 2's to deck support or facing board with two decking screws, using a level to ensure that 2 x 2's are plumb and that 2 x 6 handrail board is level with deck. Secure top of each 2 x 2 with a second screw.
Position remaining 2 x 2 boards on 5' centers, and secure with two 2-1/2' decking screws top and bottom.
Position first row of 4 Way Dek-Block+™ piers and 4 x 4 posts. Level the top of each 4 Way Dek-Block+™ pier, then insert 4 x 4 posts. Get the inside measurement for the distance between posts from the plan for the deck size you've chosen.
Determine height of deck with 2 x 6 leveler. Mark desired height of completed deck on 4 x 4 post positioned on highest ground. Mark post 1-3/4' below original mark to allow for thickness of decking. Position top edge of 2 x 6 leveler flush with second mark and nail to post. Place spirit level on top edge of leveler, nailing other end to opposite 4 x 4 post when level. Mark all posts clearly along bottom edge of leveler.
Cut 4 x 4 posts to length and position 2 x 6 support board.
Remove 4 x 4 posts from 4 Way Dek-Block+™ piers. Cut to length at marks made in Step 2. Reinsert posts in piers. Center 2 x 6 support board along top of posts.
Position remaining 2 x 6 support boards, square up, and secure to 4 x 4 posts. Position remaining 2 x 6 support boards by repeating Steps 1, 2 & 3. Distance between posts is 2' less than the distance between support boards shown on the plan for your deck. Square up by adjusting outside support boards until diagonal distance between opposite corners is EQUAL, and ends of all support boards are flush. Secure support boards to posts as shown.
Easy to follow step by step guide for professional results.
Wall, patios, driveways, walkways and more. See our complete selection.
View Catalogue